Active projects
12
4 regions
Verified elements
1,248
98.4% traceability
Potential NCRs avoided
27
Estimated this quarter
Carbon avoided
186 t
CO₂e forecast
Choose a workflow
Both layers connect to one digital passportLayer 1
Concrete Intelligence
Delivery tickets, material data, testing, curing, certificates, carbon and predictive quality risk.
Layer 2
Structural Verification
Guided site video, drawing comparison, reinforcement detection, flags and engineer review.
Unified record
Digital Assurance Passport
Design, inspection, material, laboratory and certification evidence linked to the same structural element.
| Project | Elements | Concrete records | Structural checks | Status |
|---|---|---|---|---|
| Coventry Logistics Hub | 184 | 172 | 161 | 94% compliant |
| HS2 Package C1 | 328 | 304 | 287 | 11 reviews |
| Birmingham Residential Tower | 241 | 228 | 233 | 3 potential NCRs |
Concrete elements
Foundation F-12110 m³ • verified
Wall W-0745 m³ • 7-day result
Slab S-1472 m³ • review
Column C-1818 m³ • approved
Upload delivery ticket
Demo file: Ticket_F12_ReadyMix.pdf
SupplierMidlands ReadyMixMatched
MixC35/45 GGBS40Matched
Volume108 m³2 m³ variance
Ticket time09:42Valid
Slab S-14
Beam B-07
C-18
C-19
Structural elements
Select an element to inspectSlab S-14Top reinforcement zone
Beam B-07Lap and anchorage check
Column C-18Vertical bar and links
Opening O-03Trimmer reinforcement
AI comparison results
GREEN
Main bar direction
96%Visible installation aligns with Drawing S-214 Rev C.
YELLOW
Local spacing near opening O-03
71%Possible increased spacing; engineer verification recommended.
RED
Trimmer bar T4
84%Expected bar not confidently detected in captured zone.
GREY
Bottom layer
N/ANot visible in video; no assessment made.
Element
S-14
Level 2 transfer slab
Assurance status
Conditional
1 engineer review open
Traceability
98%
Design to certificate
Before the pour
Drawing S-214 Rev C linkedApproved design revision
Guided reinforcement video recordedCoverage score 91%
AI visual comparison completed1 red, 1 yellow, 1 grey finding
Engineer review recordedCorrective evidence requested
During and after the pour
Delivery ticket verifiedC35/45 GGBS40 • 72 m³
Site tests recordedSlump 170 mm • 18.4°C
7-day strength31.8 MPa • passed
28-day certificatePending laboratory verification
Compliance trend
+8.2%
Quarter-on-quarter
Average review time
18 min
From capture to decision
Rework risk reduced
21%
Modelled pilot outcome
Carbon intensity
-14%
Against baseline mix
Top recurring risks
1
Missing trimmer bars
18 cases2
Transport delays
14 cases3
Incomplete curing records
9 casesSupplier intelligence
| Supplier | Pass rate | Carbon |
|---|---|---|
| Midlands ReadyMix | 96% | 279 kg/m³ |
| Central Concrete | 91% | 301 kg/m³ |
| GreenMix UK | 94% | 246 kg/m³ |